Contract Bid Abstract

SAP 058-667-001 - Located on CSAH 67 Between CSAH 55 and CSAH 9Midwest Contracting, LLC Kern & Tabery Inc. Gladen Construction Inc KGM Contractors, Inc. Minnerath Const., Inc. 
Item No.ItemUnitsQuantityUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal Price
2021.501MOBILIZATIONLS1$10,000.00$10,000.00$116,698.00$116,698.00$42,000.00$42,000.00$114,000.00$114,000.00$125,000.00$125,000.00
2021.601MOBILIZATION, TURF ESTABLISHMENTLUMP SUM1$2,500.00$2,500.00$3,500.00$3,500.00$3,000.00$3,000.00$4,500.00$4,500.00$12,000.00$12,000.00
2031.602PORTABLE TOILETSEACH1$750.00$750.00$1,000.00$1,000.00$500.00$500.00$500.00$500.00$2,000.00$2,000.00
2051.501MAINT & RESTORATION OF HAUL ROADSLS1$1.00$1.00$1.00$1.00$100.00$100.00$2,500.00$2,500.00$1.00$1.00
2101.501CLEARING & GRUBBINGLS1$45,000.00$45,000.00$35,000.00$35,000.00$75,500.00$75,500.00$38,000.00$38,000.00$60,000.00$60,000.00
2104.502SALVAGE PIPE APRONEACH1$50.00$50.00$200.00$200.00$450.00$450.00$600.00$600.00$200.00$200.00
2104.503SAWING BIT PAVEMENT (FULL DEPTH)L F160$6.00$960.00$3.50$560.00$6.00$960.00$2.50$400.00$5.00$800.00
2104.503REMOVE PIPE CULVERTSL F354$10.00$3,540.00$7.00$2,478.00$26.00$9,204.00$10.00$3,540.00$10.00$3,540.00
2104.503REMOVE CHAIN LINK FENCEL F88$6.00$528.00$10.00$880.00$10.00$880.00$17.00$1,496.00$15.00$1,320.00
2104.503REMOVE BARBED WIRE FENCEL F5,763$2.00$11,526.00$1.25$7,203.75$1.75$10,085.25$1.00$5,763.00$3.00$17,289.00
2104.504REMOVE BITUMINOUS PAVEMENTS Y487$4.00$1,948.00$3.50$1,704.50$7.00$3,409.00$4.00$1,948.00$10.00$4,870.00
2105.507COMMON EXCAVATION (P)C Y49,583$3.25$161,144.75$3.50$173,540.50$5.40$267,748.20$6.00$297,498.00$4.75$235,519.25
2105.507MUCK EXCAVATIONC Y75,047$6.00$450,282.00$7.00$525,329.00$5.82$436,773.54$6.00$450,282.00$8.84$663,415.48
2105.507SUBGRADE EXCAVATIONC Y8,991$3.50$31,468.50$3.50$31,468.50$5.40$48,551.40$6.00$53,946.00$4.75$42,707.25
2105.507GRANULAR BORROW MOD 15% (EV)C Y96,807$8.00$774,456.00$9.00$871,263.00$9.55$924,506.85$12.65$1,224,608.55$15.50$1,500,508.50
2118.509AGGREGATE SURFACING CLASS 5TON703$9.70$6,819.10$10.25$7,205.75$9.75$6,854.25$15.50$10,896.50$9.55$6,713.65
2123.5101.0 CU YD SHOVELHOUR5$200.00$1,000.00$150.00$750.00$320.00$1,600.00$175.00$875.00$225.00$1,125.00
2123.510DOZERHOUR5$175.00$875.00$150.00$750.00$185.00$925.00$150.00$750.00$200.00$1,000.00
2130.523WATERMGAL260$20.00$5,200.00$25.00$6,500.00$25.00$6,500.00$35.00$9,100.00$25.00$6,500.00
2211.509AGGREGATE BASE CLASS 5TON6,412$9.70$62,196.40$10.25$65,723.00$9.75$62,517.00$13.70$87,844.40$9.55$61,234.60
2412.50212X5 PRECAST CONCRETE BOX CULV END SECTEACH2$15,000.00$30,000.00$12,759.60$25,519.20$12,230.00$24,460.00$14,000.00$28,000.00$18,000.00$36,000.00
2412.50312X5 PRECAST CONCRETE BOX CULVERTL F60$1,200.00$72,000.00$965.58$57,934.80$1,385.00$83,100.00$925.00$55,500.00$1,600.00$96,000.00
2451.507COARSE AGGREGATE BEDDING (CV)C Y2,773$30.00$83,190.00$26.07$72,292.11$28.00$77,644.00$42.50$117,852.50$27.00$74,871.00
2501.50215" GS PIPE APRONEACH16$140.00$2,240.00$145.00$2,320.00$275.00$4,400.00$225.00$3,600.00$175.00$2,800.00
2501.50218" GS PIPE APRONEACH10$145.00$1,450.00$150.00$1,500.00$325.00$3,250.00$250.00$2,500.00$185.00$1,850.00
2501.50224" RC PIPE APRONEACH2$750.00$1,500.00$666.00$1,332.00$915.00$1,830.00$900.00$1,800.00$1,025.00$2,050.00
2501.50315" CS PIPE CULVERTL F336$32.00$10,752.00$24.00$8,064.00$42.00$14,112.00$38.00$12,768.00$30.00$10,080.00
2501.50318" CS PIPE CULVERTL F232$35.00$8,120.00$26.79$6,215.28$44.00$10,208.00$45.00$10,440.00$35.00$8,120.00
2501.50324" RC PIPE CULVERTL F82$62.00$5,084.00$73.00$5,986.00$84.00$6,888.00$80.00$6,560.00$87.50$7,175.00
2511.507RANDOM RIPRAP CLASS IIIC Y142.2$75.00$10,665.00$65.00$9,243.00$115.00$16,353.00$90.00$12,798.00$75.00$10,665.00
2540.602RELOCATE MAIL BOX SUPPORTEACH6$150.00$900.00$150.00$900.00$150.00$900.00$157.50$945.00$250.00$1,500.00
2563.601TRAFFIC CONTROLLS1$4,000.00$4,000.00$3,900.00$3,900.00$5,500.00$5,500.00$6,000.00$6,000.00$7,500.00$7,500.00
2573.503SILT FENCE; TYPE HIL F1,107$2.75$3,044.25$6.00$6,642.00$2.70$2,988.90$2.90$3,210.30$3.00$3,321.00
2573.503SILT FENCE; TYPE MSL F3,220$2.25$7,245.00$2.25$7,245.00$2.30$7,406.00$2.45$7,889.00$2.00$6,440.00
2573.503SEDIMENT CONTROL LOG TYPE WOOD FIBERL F1,792$3.00$5,376.00$3.00$5,376.00$3.20$5,734.40$3.40$6,092.80$4.00$7,168.00
2573.503SEDIMENT CONTROL LOG TYPE BLANKET SYSTEML F896$4.00$3,584.00$2.30$2,060.80$4.15$3,718.40$4.50$4,032.00$5.00$4,480.00
2573.510SEDIMENT REMOVAL BACKHOEHOUR10$225.00$2,250.00$150.00$1,500.00$250.00$2,500.00$160.00$1,600.00$225.00$2,250.00
2573.602FILTER BERM TYPE 3 (ROCK WEEPER MOD.)EACH20$250.00$5,000.00$238.00$4,760.00$1,250.00$25,000.00$825.00$16,500.00$750.00$15,000.00
2574.508FERTILIZER TYPE 1LB3,982$0.60$2,389.20$0.50$1,991.00$0.75$2,986.50$0.75$2,986.50$0.80$3,185.60
2574.508FERTILIZER TYPE 3LB742$1.00$742.00$0.50$371.00$0.80$593.60$0.80$593.60$0.80$593.60
2575.504MULCH MATERIAL TYPE 4S Y16,570$0.40$6,628.00$0.75$12,427.50$0.50$8,285.00$0.41$6,793.70$0.45$7,456.50
2575.504EROSION CONTROL BLANKETS CATEGORY 3NS Y23,280$1.50$34,920.00$1.60$37,248.00$1.65$38,412.00$1.65$38,412.00$1.72$40,041.60
2575.504RAPID STABILIZATION METHOD 4S Y7,946$1.80$14,302.80$0.75$5,959.50$2.00$15,892.00$2.10$16,686.60$1.85$14,700.10
2575.505SEEDINGACRE15.08$45.00$678.60$300.00$4,524.00$50.00$754.00$50.00$754.00$139.00$2,096.12
2575.505DISK ANCHORINGACRE10.55$50.00$527.50$200.00$2,110.00$55.00$580.25$55.00$580.25$39.00$411.45
2575.505RAPID STABILIZATION METHOD 1ACRE1.72$625.00$1,075.00$2,900.00$4,988.00$650.00$1,118.00$675.00$1,161.00$400.00$688.00
2575.508SEED MIXTURE 25-141LB890$4.00$3,560.00$3.60$3,204.00$3.65$3,248.50$3.80$3,382.00$5.00$4,450.00
2575.509MULCH MATERIAL TYPE 1TON21.1$425.00$8,967.50$400.00$8,440.00$500.00$10,550.00$450.00$9,495.00$139.00$2,932.90
 Totals for project SAP 058-667-001 $1,900,435.60 $2,155,808.19 $2,280,477.04 $2,687,979.70 $3,119,569.60
 
Contract Total:$1,900,435.60$2,155,808.19$2,280,477.04$2,687,979.70$3,119,569.60