Bid Abstract

CP 058-133-001 - Located on CR 133 Between CR 134 and CSAH 15KNIFE RIVER Central Specialties Inc. Minnesota Paving and Materials 
Item No.ItemUnitsQuantityUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal Price
2021.501MOBILIZATIONLS1$10,000.00$10,000.00$20,000.00$20,000.00$29,600.00$29,600.00
2051.501MAINT & RESTORATION OF HAUL ROADSLS1$1.00$1.00$1.00$1.00$1.00$1.00
2104.505REMOVE BITUMINOUS PAVEMENTS Y218$5.00$1,090.00$10.00$2,180.00$5.15$1,122.70
2104.507REMOVE AGGREGATEC Y316$18.00$5,688.00$20.00$6,320.00$14.50$4,582.00
2104.513SAWING BIT PAVEMENT (FULL DEPTH)L F44$4.00$176.00$3.00$132.00$2.00$88.00
2105.501COMMON EXCAVATION (P)C Y81$15.00$1,215.00$10.00$810.00$14.50$1,174.50
2105.507SUBGRADE EXCAVATION (P)C Y195$20.00$3,900.00$25.00$4,875.00$14.50$2,827.50
2105.521GRANULAR BORROW MOD 15% (LV)C Y267$20.00$5,340.00$35.00$9,345.00$14.50$3,871.50
2118.501AGGREGATE SURFACING CLASS 1TON356$30.00$10,680.00$27.50$9,790.00$23.60$8,401.60
2118.501AGGREGATE SURFACING CLASS 5TON170$24.00$4,080.00$30.00$5,100.00$22.20$3,774.00
2123.503MOTOR GRADERHOUR10$160.00$1,600.00$125.00$1,250.00$450.00$4,500.00
2123.5071.0 CU YD SHOVELHOUR10$150.00$1,500.00$175.00$1,750.00$400.00$4,000.00
2123.51010 CU YD TRUCKHOUR15$120.00$1,800.00$100.00$1,500.00$200.00$3,000.00
2123.521PNEUMATIC-TIRED ROLLERHOUR10$120.00$1,200.00$105.00$1,050.00$200.00$2,000.00
2211.501AGGREGATE BASE CLASS 5TON3,286$15.00$49,290.00$20.00$65,720.00$18.10$59,476.60
2232.501MILL BITUMINOUS SURFACE (4.5")S Y17,660$3.30$58,278.00$4.25$75,055.00$2.50$44,150.00
2357.502BITUMINOUS MATERIAL FOR TACK COATGAL1,271$1.50$1,906.50$2.00$2,542.00$1.60$2,033.60
2357.606BITUMINOUS MATERIAL FOR SHOULDER TACKGAL1,207$3.00$3,621.00$3.00$3,621.00$2.50$3,017.50
2360.501TYPE SP 12.5 WEARING COURSE MIX (2,B)TON3,491$48.00$167,568.00$55.41$193,436.31$68.50$239,133.50
2540.602MAIL BOX SUPPORTEACH8$110.00$880.00$110.00$880.00$119.00$952.00
2563.601TRAFFIC CONTROLLS1$10,000.00$10,000.00$1,200.00$1,200.00$1,450.00$1,450.00
2574.525COMMON TOPSOIL BORROWC Y50$50.00$2,500.00$50.00$2,500.00$51.70$2,585.00
2575.555TURF ESTABLISHMENTLS1$3,300.00$3,300.00$3,300.00$3,300.00$3,410.00$3,410.00
2580.603INTERIM PAVEMENT MARKINGL F1,160$1.00$1,160.00$0.75$870.00$0.94$1,090.40
2582.5024" BROKEN LINE EPOXY GR IN (WR)L F1,350$0.53$715.50$0.53$715.50$0.55$742.50
2582.5024" SOLID LINE EPOXY GR IN (WR)L F18,143$0.53$9,615.79$0.53$9,615.79$0.55$9,978.65
 Totals for project CP 058-133-001 $357,104.79 $423,558.60 $436,962.55
 
Contract Total:$357,104.79$423,558.60$436,962.55